Features
 Current Features
 Past Features





Feature Story - May 2008
 

Southern Colorado & Southern

Front Range Projects Roundup

Here is a sampling of recently completed or ongoing projects along Colorado's southern Front Range corridor and the southern part of the state.

advertisement

Austin Bluffs Interchange Improvements
Colorado Springs
$35.5 million
Owner: Pikes Peak Rural Transportation Authority
Engineer: CH2M Hill
Contractor: Lawrence Construction Co.
Start: Jan. 2007 Finish: Late 2008

This transportation project will transform one of the city’s busiest intersections into a single-point diamond interchange with a bridge on Austin Bluffs Parkway passing over Union Boulevard.

Bloom House
Trinidad
Owner: Colorado Historical Society
Architect: UNiT Design Studio
Contractor: White Construction Group
Start: Dec. 2007 Finish: March 2008

Exterior restoration and preservation of historic 1882 mansion.

Southern Colorado & Southern
Photo by Farr Studio

Cheyenne Mountain Zoo Exhibit
Colorado Springs
Owner: Cheyenne Mountain Zoo
Architect: The Portico Group
Contractor: GE Johnson Construction Co.
Start: Jan. 2006 Finish: Spring 2008

The Event Center, Moose Lake Lodge, is a two-story, 5,700-sq-ft wooden structure that consists of a 4,200-sq-ft main level, which has an open space that can be divided into three rooms by use of partitions. Attached to the outside of the second level will be three mews cages, which can be viewed from inside.

Southern Colorado & Southern

Colorado Springs
Fire Station No. 8
Colorado Springs
Owner: City of Colorado Springs
Architect: HB&A
Contractor: White Construction Group
Engineer: MGA Structural Engineers Inc., Farris Engineering
Start: June 2007 Finish: Jan. 2008

Located at 3737 Airport Rd., just east of the old station, the project consisted of a 12,595-sq-ft building with three apparatus bays, individual sleeping quarters, a large kitchen, dayroom, dispatch center, weight and community rooms. This building replaced the old fire station, built in 1966.

Related Links:
  • Economic Overview: Colorado Springs
  • Economic Overview: Pueblo
  • Cougar Canyon
    Trinidad
    $17 million
    Owner: Cougar Canyon Golf Resort and Spa
    Architect: Architects Studio LLC
    Contractor: Colarelli Construction
    Engineer: Anchor Engineering and Construction Inc., Plant Engineering
    Start: Spring 2008 Finish: Spring 2009

    A 35,000-sq-ft clubhouse with a 3,100-sq-ft banquet conference room, including a full kitchen and dining area, an outdoor pool with fire pits and a 75-suite hotel adjacent to the clubhouse.

    Fairfield Inn
    Monument
    $6 million
    Owner: Fairfield Inn
    Architect: Architects Studio LLC
    Contractor: Colarelli Construction
    Start: March 2008 Finish: Dec. 2008

    Construction of a new 83-room hotel.

    Southern Colorado & Southern

    Heart of the Rockies
    Regional Medical Center
    Salida
    $33 million
    Owner: Heart of the Rockies Regional Medical Center Foundation
    Architect: Davis Partnership
    Contractor: Haselden Construction, Diesslin Structures
    Start: July 2006 Finish: Feb. 2008

    A state-of-the-art, 25-bed, 85,000-sq-ft hospital located on a 25-acre campus on the west side of Colorado 291. It replaces the aging building the hospital had occupied since 1885.

    IT’Z
    Colorado Springs
    $7.5 million
    Owner: IT’Z
    Architect: Runyon Architects & Associates
    Contractor: Colarelli Construction
    Engineer: Hunt & Joiner Inc., Arjo Engineers Inc., Rockwell Consulting Inc., Entech Engineering Inc.
    Start: May 2007 Finish: Feb. 2008

    A new family fun center that includes games, rides and food.

    Southern Colorado & Southern

    Marian House Soup Kitchen, Phase 1
    Colorado Springs
    Owner: Catholic Charities
    Architect: Bollar Cruz Architects
    Contractor: JE Dunn Construction
    Engineer: M-E Engineers Inc., Obering, Wurth & Associates
    Start: June 2007 Finish: May 2008

    This project includes construction of new 15,700-sq-ft kitchen and dining facilities in the first phase and construction of office and administrative areas in the second phase, which is currently in redesign.

    Southern Colorado & Southern

    Monument Academy
    Colorado Springs
    $9.3 million
    Owner: Lewis Palmer School District 38
    Architect: Hutton Architecture Studio
    Contractor: JE Dunn Construction
    Engineer: Shaffer Baucom Engineering, The Sheflin Group Inc., Classic Consultants
    Start: Dec. 2007 Finish: Sept. 2008

    A 74,004-sq-ft, three-story replacement charter school that will include a gymnasium and library and utilize donated or reused items, including furniture, doors, door hardware and flooring.

    Southern Colorado & Southern

    NorthCare at St. Francis
    Woodmen and Powers
    $22 million
    Owner: NorthCare LLC
    Architect: RTA Architects
    Contractor: Colarelli Construction
    Engineer: Sol Chavez, Plant Engineering, MGA Structural Engineers
    Start: Aug. 2007 Finish: Aug. 2008

    A new medical office building to house various medical practices.

    Southern Colorado & Southern

    Pagosa Springs Mountain Hospital
    Pagosa Springs
    $9 million
    Owner: Upper San Juan Health Services Dist.
    Architect: Prochaska & Associates
    Contractor: GE Johnson Construction Co.
    Start: Oct. 2006 Finish: Jan. 2008

    A 29,000-sq-ft acute care hospital with nursing care, a full-time laboratory, CT digitized scanning, radiology, EKG and EEG services. Future services will be added to enhance the hospital's capabilities.

    Peak Vista Community
    Health Center Renovation
    Colorado Springs
    $3.5 million
    Owner: Peak Vista Community Health
    Architect: James W Nakai & Associates
    Contractor: GE Johnson Construction Co.
    Start: Aug. 2007 Finish: Jan. 2008

    The Colorado Springs Special Projects Department performed the interior remodel at the Peak Vista Community Health Center, along with the addition of a new grand entrance and stairwell. The completion of this 34,000-sq-ft health care center allowed Peak Vista to provide multiple services to a wide range of patients at one facility.

    Pikes Peak School
    of Expeditionary Learning
    Falcon
    $3.7 million
    Owner: CB Richard Ellis
    Architect: SlaterPaull Architects
    Contractor: Colarelli Construction
    Engineer: Redwine Engineers, Envision Mechanical Engineers
    Start: Feb. 2008 Finish: Aug. 2008

    A new charter school for students in Falcon.

    Pueblo Social Security
    Administration Building
    Pueblo
    Owner: Simco Ventures West
    Architect: Randal Friesen Architecture
    Contractor: White Construction Group
    Engineer: Clark Engineering
    Start: Jan. 2008 Finish: Aug. 2008

    Southern Colorado & Southern

    St. Francis Medical Center
    Colorado Springs
    $151 million
    Owner: Centura Health
    Architect: RTA Architects
    Contractor: GE Johnson Construction Co.
    Start: June 2006 Finish: June 2008

    This project consists of a seven-story hospital, 1,100-stall parking structure, helipad/maintenance hangar and an attached medical office building. The hospital will have 158 beds and six operating rooms.

    TriLakes YMCA
    Monument
    $10 million
    Owner: YMCA of the Pikes Peak Region
    Architect: LKA Partners Inc.
    Contractor: GE Johnson Construction Co.
    Start: June 2007 Finish: May 2008

    The complex is a 45,761-sq-ft recreational facility that will feature a zero entry swimming pool with a play structure, full-court gymnasium for basketball and volleyball, strength and conditioning room for weight lifting, exercise room, locker room, a child care area and community meeting rooms.

    Southern Colorado & Southern

    T. Rowe Price T1
    Colorado Springs
    $2.9 million
    Owner: T. Rowe Price
    Architect: Gensler
    Contractor: JE Dunn Construction
    Engineer: Swanson/Rink
    Start: May 2008 Finish: Nov. 2008

    Remodel of the second and third floors of Building One on the T. Rowe Price campus.

    UCCS Engineering and Science Building
    Colorado Springs
    $53 million
    Owner: University of Colorado at Colorado Springs, State of Colorado
    Architect: AR7 Hoover Desmond Architects
    Contractor: Gerald H. Phipps
    Start: Aug. 2006 Finish: June 2008

    Construction of a 157,00-sq-ft building that will house expanded space for teaching and research. LEED certification is being sought.

    Union Senior Living
    Colorado Springs
    $34 million
    Architect: Lantz-Boggio Architects
    Contractor: Palace Construction
    Start: Fall 2006
    Finish: Dec. 2007

    A four-story, 230,395-sq-ft building with detached garages and related sitework and infrastructure. Construction is post-tension, slab-on-grade with metal studs, cementatious siding and simulated veneer stone.

    Southern Colorado & Southern

    Victor High School
    Addition, Renovation
    Cripple Creek
    $9 million
    Owner: Cripple Creek — Victor School District RE-1
    Architect: LKA Partners
    Contractor: JE Dunn Construction
    Engineer: Systems Engineering, Consulting Engineers Inc., Terra Nova Engineering
    Start: April 2008
    Finish: March 2009

    The project includes an 18,000-sq-ft addition and 45,000 sq ft of remodel. The remodel will include new mechanical and electrical systems while the addition on the north side of the building will include a new kitchen, stage, common area and lockers.

    Village at Skyline
    Colorado Springs
    $8.3 million
    Owner: Brookdale Senior Living
    Architect: James W. Nakai & Associates
    Contractors: JE Dunn Construction
    Engineer: Sol Chavez & Associates, Consulting Engineers Inc., Classic Consulting Engineers & Surveyors
    Start: TBD
    Finish: TBD

    This 45,000-sq-ft project will add a five-story nursing tower attached to the existing five-story building.

     

    Click here for more Features >>

     


     


    Sponsors

     

    © 2008 The McGraw-Hill Companies, Inc.
    All Rights Reserved